Former director and general manager of a subsidiary in France of Smar, a manufacturer world leader and first manufacturer of pressure instruments fitted with the  Fieldbus technology in 1994, I am oriented by the search of results and know how to work in all environments.

 

Former application engineer senior employed for many years by  several top manufacturers of equipments for  automation of the industry in general and for manufacturers of equipments built for the petroleum industry in particular, I perfectly control all the technical aspects of the instrumentation installed in zones presenting risks of fire and explosions as well as the technique of Fieldbus .

 

I can design projects as well as install them in the field.

 

I have a perfect understanding of all the control systems used in the plants , from the high power distribution to the power production, as well as the instrumentation and the automation.

Today an electrotechnician must understand everything and so I do, after having started from zero in 1962.

 

I understand the technique as a project , in computer files, as well as in the field, as equipment .

 

I am literate in the computer techniques and work with computers since twenty years and can use and write applications using several different softwares.

In my last job, I have worked with the best available technology existing worldwide,  speaking exactly, a power plant based on diesel generators controlled with automatic digital paralleling power commands .It is still very unique, and I was very surprised that this exists, knowing how complicated the synchronizing can be when you do not have the right equipment.

I have worked for ABB, Siemens,Toshiba, Allen Bradley, Reliance Electric,(Rockwell) Sistema Automation,SMAR, worldwide known manufacturers.

 I am a true polyglotte in my Professional area and know English perfectly, but I also speak , French , German , Portuguese, Spanish, Polish.

that I have copied with a keyboard. (Use the keyboards of Lexilogos).

 

I have worked in Qatar on the Island Halul, as instrument engineer during the construction of a new power plant composed of three gas turbines Tempest  10 MW ,

 and also have  worked on the platform Oso in Nigeria, Brazil, Angola, Zambia, Mexico, China ,Germany, France, etc.

 

 

 

 

Tade WANCLIK

 

 

 

ELECTRICITY- Rotating Machines and their protection  ,

control  command. Switchgears .High voltage lines transmission

INSTRUMENTATION- AUTOMATION ENGINEER/ MANAGER

 

 

 

 

FORMATION

 

v      Lycee Technique Louis Rascol .Albi (81).BREVET DE TECHNICIEN ELECTROTECHNICIEN . (3 years - 40 hours /week) Graduated in 1965

v      Classe de Techniciens Superieurs .Albi(81 ) – BREVET DE TECHNICIEN SUPERIEUR ELECTROTECHNICIEN .(2 years - 40 hours /week) Graduated in 1967

v      Maitrise d’Electrotechnique.1968

v      Validation des acquis professionnels .DESS INFORMATIQUE INDUSTRIELLE – Paris VI. 2003

v      Informatique depuis  1987: (PC - Word - Excel – RSLOGIX-RSVIEW-outils de configuration analogique et numérique des instruments utilisés en instrumentation et en électrotechnique)

 

 

LANGUES LANGUAGES MOTHER TONGUE POLISH AND FRENCH

v      Anglais                      English                       current

v      Allemand                  German                      current

v      Portugais brésilien    Portuguese    current

v      Polonais                    Polish                        current

v      Espagnol                   Spanish                    current

v      Russe                         Russian                     understood

v      Arabe                Arabic           written with my dictionnary

v      Chinois             Chinese       with internet motors

v      Japonais            Japanese     understood with my japanese english dictionary on line

v      autres           others                with internet motors

           

           

 

 

 TRACK RECORDS

2009

                                                  CSH  Compressor System Holland

     Project engineer for the construction of nitrogene compressors of 30 bars i

2008

Total –Raffinerie des Flandres Dunkerque

Supervisor  E&I  for the construction of a new sub-station 90 kv/20 kv in the refineryr

2007 _2008

Total –Mitteldeutschland in Spergau Germany

Supervisor  E&I  for the revamping of the ADU VDU  project of the Refinery  Total  Mitteldeutschland, that produces 11 million of tons of products a year

2007 juin

GSK Copenhague Danemark

·         Consultant for the electric installations and of the distribution of internet for the construction of a factory of pharmaceutical fluids of Saint Amand les Eaux

Total -Indeni( Zambia)

Project manager for the construction of the power plant of the refinery, composed of 5 gensets diesel of 5 MVA  fitted with digital paralleling  for automatic operation and supervised by a scada system Iconix

 

 

2006

Total ( Fos sur Mer )

Commissionning of the gensets of 3080 kw installed on the platform Rosa built in Fos sur Mer by Ponticelli /Eiffel as well as of the control panels of the electric control room,

Settings of the protections of the generators and of the feeder of the homopolar protection, of the transformers and of the motors of 1700 kw , as well as the link to the Girassol power system. Pre-commissionning of the synchronisation.

 

 

2005

Beture ( Saint-Quentin en Yvelynes )

        Instrument and electric engineer     

Specification of an industrial control system of unit for treatment of industrial rejects .The task was to include a third line of production In a factory having two lines, near of Le Havre .It was necessary to create a new control room able to treat the two existing lines and the new one, installing new control devices able to run the new unit and all the the existing systems, The new system had to be the state of the art in that time, and be assembled and started up with the lesser shut-down time possible.Specification of the inclusion of a new vision system             

AMEC Spie  MOBIL- EXXON(Nigeria)

Reconstitution of the cabling of the instrumentation of the compressor substituted on the platform OSO after a fire. Project of the connection diagrams adapted to the existing instrumentation , instruction of the work to be done by the  cable pullers and connectors inside of the different junction boxes and in the control room. Coordination of the pulling of the cables and their connection , Daily reports .Reconstitution of the necessary data for the safe execution of the task .Coordination of the verification of 1200 loops existing in the unit that produced 300 00 barrils a day

 

 

                                                                                                                                ALSTOM (Mexique)

 

2002            Supervisor Electricity Instrumentation

 Supervisor of the start-up of the installations of the loading of petcoke and of the limestone of TEG1, a thermal power unit of 200 MVA .Setting in conformity of the 6 kv sub-stations manufactured by Cuttler Hammer and ABB ;setting of the protection relays .Setting in conformity of the motor control centers .Supervision of the cabling and of the plc  and supervisory system Allen Bradley.Tests of operation.

 

2002                                                                  Bouygues OFFSHORE (Angola)

Mission in Angola at the SOYO base.Chief electrician of the industrial base and of the  life-base of Soyo *that is the land base of the Girassol platform.Maintenance of the diesel generators.Maintenance of the sub-stations.New works.

 

2001                                                          ElfTotalfinaQatar (Qatar)

Mission in QATAR ;instrument engineer on the island of Halul

Commissionning of the instrumentation of three turbo-generators of  MVA each.

Commissionning of the gas and air compressors, of HVAC , of the programmables controllers Allen Bradley and of the supervisory systems RS View; of the fiber optic Ethernet nets

2001                                                            Stein Heurtey –Salzgitter (Allemagne)

   

 

Mission in Germany by Salzgitter.Start up of electric motors, configuration of  control valves, of the scaznner of temperature, pressure transmitters, flow transmitters on the new built plant for ganvalization by fire of steel plates

                                                       

                                                 Thiessen Carbotecnica à Ilva Taranto(Italie)

Assistance for a correction of a control system based on Reliance Electric motor control drives in the cokery

 

2000                                                                 Glassverbel(Belgique).

 

 Action for a start-up of a control system of a glass-furnace

2000                                                                   Paris, La Défense

                      

Instrument engineer acting for a projet de a liquefied gas modelling

 

1999                                                           Songben Shunde (Chine)

 

 Electrotechnician. Project of line of circuit-breakers 6-100 Amps 600 volts

1999                                                                     Qafco Qatar et Abu-Dhabi

 

Application engineer. Installation and start-up of new fonctionalities of two systems of loading sulfur one in Abu Dhabi , the other in Qatar

1998.1999                                                  Education Nationale 

Teacher of Electrotechnics

 

 

1997-1998                                     GIS Missions d’intérim (Paris)

:Programmations, mise en route de systèmes électriques et d’informatique.

 Programming and start-up of an industrial system.

1994-1997                                                                 Smar France.

.

 General Manager of the subsidiary in  France of Smar. SMAR is the company that has manufactured the first fieldbus instruments but specially the pressure transmitters

1994                                                               Nestlé (Araçatuba, Brésil)

                                                                          Reliance Electric (Rockwell).

 Engineer contracted to install a modernization of the system of reception of the milk.  In three months  I have designed and installed , without stopping the operation of the factory,of a control system based on touch-screen Nematron panels and Plc  Reliance Electric

 

1987-1994                                              Sistema Automation Industrial (Sao-Paulo)

                                  

Application Engineer Senior for Sistema Automation industrial. This brazilian company was manufacturing PLC’s and supervosory systems for Petrobras. This company was the only company allowed to supply the off-shore platforms build and installed in Brazil. This equipments were the most efficient devices existing in that time

1981-1987                                               Jatic (Diadema.Sao-Paulo)

  I  started my activity in this company , that was one the three classified to manufacture panels for instrumentations for Petrobras.making pricings. In few time I had to project and execute the control for the dam of Pericumao, a big serie of detectors of medium dc voltage for the transportation system of the city of Recife.  I have been sent on the first platform offshore NAMARODO  to resolve problem occuring in the metering of oil and gas,I had to quote the execution of a prototype of a photomaton photography robot machine and to execute it, I  had to project and manufacture detector of smoke and fire in the control room of the Itaipu Dam

1979-1981                                                 Allen-Bradley. (Sao-Paulo)

                                  Ingénieur d’application.

 I have been hired to write and sign all the proposal done by Allen Bradley , as this company arrived in Brazil. I quoted plcs and turn key systems. 200 fiber panels for the aluminium industry, etc

Motor control centers for low and medium voltage

 

1978                                                         Liebherr do Brasil.(Sao-Paulo)

Chief of the electric department in the new installed factory of cranes in Brazil

1977-1978                                                     Toshiba do Brasil.(Sao-Paulo )

Electrical engineer for the factory of big motors and generators. I was in charge of the applications and the quotations

1976-1977                                                       Sace. Sao-Paulo-Brésil)

Sace was manufacturing high voltage panels.  I was making pricings and projects. 

1974.1975                      Fleischer Ingénieur-Büro (Mannheim. Allemagne)

1974.1976                     

Instrument and Electrical engineer I was working for BASF

 

1973-1974                                                   Deutsche Interim Service à Mannheim.

Instrument and Electrical engineer I was working for BBC and ITT

 

1972                                                  Monomertechnik.

I was foreman for the start-up for the installation of the bagages transportation system of the new built airport of Frankfurt

1971-1972                                   Student of japanese in Tokyo.

1971…..   Eurokon.

Electrical engineer for Siemens in Hamburg

 

Student of english in London

1970     

 ENGINEER of instrumentation by Koppers in ESSEN   

1968-1969      Paris. Chief Electrician

                                                                

 

 

 

 

                      

 

RENSEIGNEMENTS PERSONNELS

 

Date de Naissance  10 Juillet 1945 /Nationalité Française / Situation Familiale /       Marié, 3 enfants universitaires.

Email :                   wanclikt@yahoo.fr

Portable               +33 6 67 99 97 83

 

 

CURRICULUM VITAE

 

ELECTROTECHNICAL  INSTRUMENTALIST ENGINEER

 

 

                                               Date of Birth                           : 10- July - 1945

 

                                               Birhplace                                : ALBI

 

                                               Nationality                              : FRENCH

 

                                               Marital Status                         : MARRIED

 

                                               Foreign languages                  :  ENGLISH, GERMAN, PORTUGUESE, SPANISH,POLISH

 

                                               Date of entry                           : 

 

 PARTICULAR SKILLS : FIELDBUS FOUNDATION INSTRUMENTATION

 POST : ELECTROTECHNOLOGIST ELECTRONICS ENGINEER

 MAIN  REFERENCES : ROCKWELL AUTOMATION , SMAR , TOSHIBA , TOTALFINAELF QATAR ,  SALZGITTER FOR STEIN HEURTEY ,  ALSTOM,TOTAL

 

(7 janvier 2005)

 

 

QUALIFICATIONS :

 

 


  YEAR                         DIPLOMA  - SPECIALIZATION - INSTITUTION - LOCATION

 

1.               DIPLOMA IN ELECTROTECHNICIEN STUDIES (BTS) – RASCOL HIGHSCHOOL – ALBI (FRANCE)

2.               ELECTROTECHNIC STUDIES- MAITRISE – UNIVERSITY OF TOULOUSE   (FRANCE)

 

 

 

 

 

 

 

 

ADVANCEDTRAINING COURSES :

 

 


       INSTITUTION                               YEAR                             DETAILS 




UNIVERSITY OF PARIS VI               2003                    VALIDATION OF

                                                                             PROFESSIONAL ASSETS

                                                                                          http://twanclik.free.fr/10071945.htm

 

 

 

PROFESSIONAL EXPERIENCE SINCE 1968 AS ENGINEER AND MANAGER :

2006 Total-Indeni ( Zambia )

*      Project manager of the  construction of the power plant built in the refinery.

 

 

 

2006 Total ( Fos sur Mer )

*      Technicien Supérieur  Electricité et Instrumentation.  ENGINEER ELECTRICITY and INSTRUMENTATION

Commissionning of two  Diesel  generators of 3080 Kw installed on the platform Rosa  built in Fos sur Mer by PONTICELLI/EIFFEL and also commissionning of the switchgears installed in the electric control room setting of the protection relays of the generators, of the incoming GIRASSOL , the output of the homopolar protection, the transformers and the potor of 1700 kw.Pre-commissionning of the synchronisation.

 

 

Client                      

 

   BETURE        Saint Quentin en Yvelines  2005

                          Engineer electricity and  instrumentation ;Specification of an industrial control of a treatment plant of industrial wastes located near Le Havre ;For the reason of an expansion, it was necessary to modify the whole control system and install a system able to control the new third line of production and include the existing first and second line.The control specified brought with it the new existing technologies of optic fiber and high speed resolution .Specification of the new system of vision of the process with remote-controlled cameras

Mobil Exxon

Subsidiary                TRINDEL NIGERIA LIMITED Subsidiary  AMEC SPIE

Location                   PLATFORM OSO Mobil Exxon

Date                         December 2004 

 

POST : SUPERVISOR ELECTRICITY INSTRUMENTATION

Planning and supervision of  the installation of the cabling for the restoration  of the new compressor installed on OSO platform

And supervision of the existing loops in a live plant.

 

 

Client                       ALSTOM

Subsidiary                TEC THERMIC POWERPLANT

Location                   TAMUIN  MEXIQUE

Date                         July 2002  -  November 2002

 

POST :START UP SUPERVISOR FOR THE PETCOKE LOADING

 

TESTING OF ALL CONTROL DEVICES AND INTERCONNECTION MEDIUM AND LOW VOLTAGE. INSTRUMENTATION. METERING PROTECTION. PLC. SUPERVISION

 

                                  

Client                       BOUYGUES

Subsidiary                SOYO   ANGOLA

Location                   SOYO BASE OF GIRASSOL PLATFORM

Date                         January 2002    - April 2002

 

POST : BASE’S CHIEF ELECTRICIEN

                                      MAINTENANCE OF POWERPLANTS  ; CONDUCTION OF NEW PROJECTS

                                    

 

Client                       TOTALFINA QATAR

Subsidiary                HALUL

Location                   HALUL QATAR

Date                         July 2001  -  December 2001

 

POST :INSTRUMENTATION ENGINEER - COMMISSIONING

START UP OF THREE GAZ / DIESEL GENERATORS 10 MVA

START UP OF AUXILIARY SERVICES, AIR COMPRESSORS, GAZ COMPRESSORS HIGH VOLTAGE SUB-STATION

MEDIUM VOLTAGE SUBSTATION

FIRE DETECTION ; HVAC

PLC ALLEN BRADLEY WITH FIBER OPTIC ETHERNET

SUPERVISORY SYSTEM                                          

 

 

Client                       SALZGITTER

Subsidiary                SALZGITTER HOT STEEL GALVANISATION CENTER

Location                   SALZGITTER  GERMANY

Date                         Mars 2001   - July 2001

POST : STARTING UP SUPERVISOR – BACK UP OF THE SUBSIDIARY’S SITE’S CHIEF

CALIBRATION OF ALL INSTRUMENTS AND ACTUATORS FOXBORO ABB  ETC

SUPERVISION OF THE  SYSTEM  CONTROL OF THE OFENS IN THE CENTRAL CONTROL SYSTEM SUPPLIED BY SIEMENS

 

PROFESSIONAL EXPERIENCE :

 

Client                       BASF ANVERS

Subsidiary                BASF ANVERS

Location                   ANVERS

Date                         1997

 

POST :GENERAL MANAGER OF SMAR FRANCE see photo of the Mesucora Paris 1996

 

SETTING IN SERVICE OF AN AUTOMATIC METERING OF DENSITY OF 250 POINTS  THAT HAS REPLACED A MAN METERING INTO THE  CENTRAL SYSTEM HONNEYWELL ; NEW SYSTEM BASED IN DIFFERENTIAL PRESSURE METERING AND CONVERTED FROM FIELDBUS PROTOCOL INTO ANALOGIC 4-20mA .

 

 

 

Client                       SIDERURGIE CSN

Subsidiary                VOLTA REDONDA

Location                   VOLTA REDONDA BRESIL

Date                         1987/1990

 

POST : SENIOR  APPLICATION ENGINEER

 

REVAMPING OF THE FULL CONTROL SYSTEM OF THE HIGH FURNACE NR3 ACCIDENTED , WORK EXECUTED IN THE FACTORY LOCATED IN SAO PAULO AND INSTALLED IN TWO TIMES BY INTERRUPTION OF 72 HOURS ; EXECUTION AND COORDINATION OF PLC PROGRAMMS FOR 800/4000 ; POINTS  800 FOR REGENENERATORS ;  4000 FOR LOADING COORDINATION WITH PROCESS COMPUTER PROGRAMMERS AND ADMINISTRATION COMPUTERS

NO INTERRUPTION OF SERVICE USING HOT STAND BY PLC.

 

 

 

Client                       NESTLE BRAZIL

Subsidiary                ARACATUBA

Location                   ARACATUBA

Date                         1994

 

POST : SENIOR  APPLICATION ENGINEER

 

REVAMPING OF THE FULL CONTROL SYSTEM OF THE MILK UNLOADING OF A FACTORY PROCESSING MILK;

HOT PASSING AN OLD CONTROL BASED ON SWITCHES INTO A MODERN CONTROL STATION BASED ON PLC AND TOUCH SCREEN PANELS NEMATRON;

 I HAVE WRITTEN ALL PROGRAMS ANS ALL DATA SHEETS FOR EXCHANGING CABLING ;WORK EXECUTED IN 3 MONTHS:  2 OF STUDIES AND ONE OF EXECUTION.