mailto:wanclikt@yahoo.fr
0033950034095 land line
0033667999783 portable
http://wanclik.consultor.free.fr/
Former director and general manager
of a subsidiary in France of Smar, a manufacturer
world leader and first manufacturer of pressure instruments fitted with
the Fieldbus
technology in 1994, I am oriented by the search of results and know how to work
in all environments.
Former application engineer senior
employed for many years by several top
manufacturers of equipments for
automation of the industry in general and for manufacturers of
equipments built for the petroleum industry in particular, I perfectly control
all the technical aspects of the instrumentation installed in zones presenting
risks of fire and explosions as well as the technique of Fieldbus .
I can design projects as well as
install them in the field.
I have a perfect understanding of
all the control systems used in the plants , from the
high power distribution to the power production, as well as the instrumentation
and the automation.
Today an electrotechnician
must understand everything and so I do, after having started from zero in 1962.
I understand the technique as a project , in computer files, as well as in the field, as
equipment .
I am literate in the computer
techniques and work with computers since twenty years and can use and write
applications using several different softwares.
In my last job, I have worked with
the best available technology existing worldwide, speaking exactly, a power plant based on
diesel generators controlled with automatic digital paralleling power commands
.It is still very unique, and I was very surprised that this exists, knowing
how complicated the synchronizing can be when you do not have the right
equipment.
I have worked for ABB, Siemens,Toshiba, Allen Bradley,
Reliance Electric,(Rockwell) Sistema Automation,SMAR, worldwide known manufacturers.
I am a true polyglotte
in my Professional area and know English perfectly, but I also speak , French , German , Portuguese, Spanish, Polish.
that
I have copied with a keyboard. (Use the keyboards of Lexilogos).
I have worked in
and also have
worked on the platform Oso in
|
Tade WANCLIK
ELECTRICITY- Rotating Machines and
their protection ,
control
command. Switchgears .High voltage lines transmission
INSTRUMENTATION-
AUTOMATION ENGINEER/ MANAGER
FORMATION
v
Lycee
Technique Louis Rascol .Albi (81).BREVET DE
TECHNICIEN ELECTROTECHNICIEN . (3 years - 40 hours /week) Graduated in 1965
v
Classe de Techniciens
Superieurs .Albi(81 ) –
BREVET DE TECHNICIEN SUPERIEUR ELECTROTECHNICIEN .(2 years - 40 hours /week)
Graduated in 1967
v
Maitrise
d’Electrotechnique.1968
v
Validation des acquis professionnels .DESS INFORMATIQUE
INDUSTRIELLE – Paris VI. 2003
v
Informatique depuis
1987: (PC - Word - Excel – RSLOGIX-RSVIEW-outils
de configuration analogique et numérique des instruments utilisés en
instrumentation et en électrotechnique)
LANGUES LANGUAGES MOTHER
TONGUE POLISH AND FRENCH
v
Anglais
English current
v
Allemand German current
v
Portugais brésilien Portuguese current
v
Polonais Polish current
v
Espagnol Spanish current
v
Russe Russian understood
v
Arabe Arabic written with my dictionnary
v
Chinois Chinese with internet motors
v
Japonais Japanese understood with my japanese
english dictionary on line
v
autres others with internet motors
TRACK
RECORDS
2009
CSH Compressor
System Holland
Project engineer for the
construction of nitrogene compressors
of 30 bars i
2008
Total
–Raffinerie des Flandres Dunkerque
Supervisor E&I for the construction of a new sub-station 90
kv/20 kv in the refineryr
2007 _2008
Total
–Mitteldeutschland in Spergau
Germany
Supervisor E&I for the revamping of the ADU VDU project of the Refinery Total Mitteldeutschland, that produces 11 million of tons of
products a year
2007 juin
GSK
Copenhague Danemark
· Consultant for the electric installations and of the distribution of internet for the construction of a factory of pharmaceutical fluids of Saint Amand les Eaux
Total
-Indeni( Zambia)
Project
manager for the construction of the power plant of the refinery, composed of 5 gensets diesel of 5 MVA
fitted with digital paralleling
for automatic operation and supervised by a scada
system Iconix
2006
Total
( Fos sur Mer )
Commissionning of the gensets of 3080 kw installed on the platform Rosa built in Fos sur Mer
by Ponticelli /Eiffel as well as of the control
panels of the electric control room,
Settings of the protections of the generators and of the feeder of the homopolar protection, of the transformers and of the motors
of 1700 kw , as well as the link to the Girassol power system. Pre-commissionning
of the synchronisation.
2005
Beture
( Saint-Quentin en Yvelynes )
Instrument and
electric engineer
Specification of an industrial control system of unit for treatment of
industrial rejects .The task was to include a third line of production In a
factory having two lines, near of Le Havre .It was necessary to create a new
control room able to treat the two existing lines and the new one, installing
new control devices able to run the new unit and all the the
existing systems, The new system had to be the state of the art in that time,
and be assembled and started up with the lesser shut-down time possible.Specification of the inclusion of a new vision
system
AMEC Spie MOBIL- EXXON(Nigeria)
Reconstitution
of the cabling of the instrumentation of the compressor substituted on the
platform OSO after a fire. Project of the connection diagrams adapted to the
existing instrumentation , instruction of the work to be done by the cable pullers and connectors inside of the
different junction boxes and in the control room. Coordination of the pulling of
the cables and their connection , Daily reports .Reconstitution of the
necessary data for the safe execution of the task .Coordination of the
verification of 1200 loops existing in the unit that produced 300 00 barrils a day
ALSTOM
(Mexique)
2002 Supervisor Electricity
Instrumentation
Supervisor of
the start-up of the installations of the loading of petcoke
and of the limestone of TEG1, a thermal power unit of 200 MVA .Setting in
conformity of the 6 kv sub-stations manufactured by Cuttler Hammer and ABB ;setting of the protection relays
.Setting in conformity of the motor control centers
.Supervision of the cabling and of the plc
and supervisory system Allen Bradley.Tests of
operation.
2002
Bouygues OFFSHORE (Angola)
2001
ElfTotalfinaQatar (Qatar)
Commissionning of the instrumentation of three
turbo-generators of MVA each.
Commissionning of the gas and air compressors, of
HVAC , of the programmables controllers Allen Bradley
and of the supervisory systems RS View; of the fiber
optic Ethernet nets
2001
Stein Heurtey –Salzgitter (Allemagne)
Mission in Germany
by Salzgitter.Start up of electric motors,
configuration of control valves, of the scaznner of temperature, pressure transmitters, flow
transmitters on the new built plant for ganvalization
by fire of steel plates
Thiessen Carbotecnica
à Ilva Taranto(Italie)
Assistance for a correction of a control system based on Reliance Electric motor control drives in the cokery
2000
Glassverbel(Belgique).
Action for a start-up of
a control system of a glass-furnace
2000
Paris, La Défense
Instrument
engineer acting for a projet de a liquefied
gas modelling
1999
Songben Shunde
(Chine)
Electrotechnician.
Project of line of circuit-breakers 6-100 Amps 600 volts
1999
Qafco Qatar et Abu-Dhabi
Application engineer.
Installation and start-up of new fonctionalities
of two systems of loading sulfur one in Abu Dhabi , the
other in Qatar
1998.1999 Education
Nationale
Teacher
of Electrotechnics
1997-1998 GIS Missions
d’intérim (Paris)
:Programmations,
mise en route de systèmes électriques et d’informatique.
Programming and start-up of an industrial
system.
1994-1997
Smar France.
.
General Manager of the subsidiary in France of Smar.
SMAR is the company that has manufactured the first fieldbus instruments but specially the pressure transmitters
1994
Nestlé (Araçatuba,
Brésil)
Reliance Electric (Rockwell).
Engineer contracted to install a modernization of the system of reception of the milk. In three months I have designed and installed ,
without stopping the operation of the factory,of a control system based on touch-screen Nematron panels and Plc Reliance Electric
1987-1994 Sistema
Automation Industrial (Sao-Paulo)
Application Engineer
Senior for Sistema Automation industrial.
This brazilian company was manufacturing PLC’s and supervosory
systems for Petrobras. This
company was the only company
allowed to supply the off-shore platforms build and installed
in Brazil. This equipments were the most
efficient devices existing
in that time
1981-1987 Jatic (Diadema.Sao-Paulo)
I started
my activity in this company , that was one the
three classified to
manufacture panels for instrumentations for Petrobras.making
pricings. In few time I had
to project and execute the control for the dam of Pericumao, a big serie of detectors
of medium dc voltage for the
transportation system of the city of Recife. I have been sent on the
first platform offshore
NAMARODO to resolve
problem occuring in the metering of oil and gas,I
had to quote the execution of a prototype of a
photomaton photography robot machine and to execute it, I had to project and manufacture detector of smoke and fire
in the control room of the
Itaipu Dam
1979-1981
Allen-Bradley. (Sao-Paulo)
Ingénieur d’application.
I
have been hired to write and sign all the
proposal done by Allen
Bradley , as this company arrived in Brazil. I quoted plcs and
turn key systems. 200 fiber panels for the aluminium industry, etc
Motor
control centers for low and medium voltage
1978
Liebherr do
Brasil.(Sao-Paulo)
Chief
of the electric department in the new installed factory of cranes in Brazil
1977-1978 Toshiba
do Brasil.(Sao-Paulo )
Electrical
engineer for the factory of big motors and generators.
I was in charge of the
applications and the quotations
1976-1977
Sace. Sao-Paulo-Brésil)
Sace was manufacturing high voltage
panels. I was making pricings and projects.
1974.1975 Fleischer Ingénieur-Büro
(Mannheim. Allemagne)
1974.1976
Instrument and Electrical engineer I was working for BASF
1973-1974
Deutsche
Interim Service à Mannheim.
Instrument and Electrical engineer I was working for BBC and ITT
1972 Monomertechnik.
I was foreman for the start-up for the installation of the bagages
transportation system of the new built
airport of Frankfurt
1971-1972
Student of japanese in Tokyo.
1971….. Eurokon.
Electrical
engineer for Siemens in Hamburg
Student
of english in London
1970
ENGINEER of instrumentation by Koppers in
ESSEN
1968-1969
Paris. Chief
Electrician
RENSEIGNEMENTS
PERSONNELS
Date de
Naissance 10 Juillet
1945 /Nationalité Française / Situation Familiale / Marié, 3 enfants universitaires.
Email : wanclikt@yahoo.fr
Portable +33 6 67 99 97 83
CURRICULUM VITAE
ELECTROTECHNICAL INSTRUMENTALIST ENGINEER
Date
of Birth : 10-
July - 1945
Birhplace : ALBI
Nationality : FRENCH
Marital
Status : MARRIED
Foreign
languages : ENGLISH, GERMAN, PORTUGUESE, SPANISH,POLISH
Date
of entry :
PARTICULAR SKILLS : FIELDBUS FOUNDATION
INSTRUMENTATION
POST : ELECTROTECHNOLOGIST ELECTRONICS
ENGINEER
MAIN
REFERENCES : ROCKWELL AUTOMATION , SMAR , TOSHIBA ,
TOTALFINAELF QATAR , SALZGITTER FOR
STEIN HEURTEY , ALSTOM,TOTAL
(7 janvier
2005)
QUALIFICATIONS
:
YEAR DIPLOMA - SPECIALIZATION - INSTITUTION - LOCATION
1.
DIPLOMA
IN ELECTROTECHNICIEN STUDIES (BTS) – RASCOL HIGHSCHOOL – ALBI (FRANCE)
2.
ELECTROTECHNIC
STUDIES- MAITRISE –
ADVANCEDTRAINING
COURSES :
INSTITUTION YEAR DETAILS
PROFESSIONAL ASSETS
http://twanclik.free.fr/10071945.htm
PROFESSIONAL
EXPERIENCE SINCE 1968 AS ENGINEER AND MANAGER :
2006 Total-Indeni (
* Project manager of the construction of the power plant built in the
refinery.
2006 Total ( Fos sur Mer )
*
Technicien Supérieur Electricité
et Instrumentation. ENGINEER ELECTRICITY and
INSTRUMENTATION
Commissionning of two
Diesel generators of 3080 Kw installed on the platform Rosa built in Fos sur Mer by PONTICELLI/EIFFEL and
also commissionning of the switchgears installed in
the electric control room setting of the protection relays of the generators,
of the incoming GIRASSOL , the output of the homopolar
protection, the transformers and the potor of 1700 kw.Pre-commissionning of the synchronisation.
Client
BETURE Saint Quentin en Yvelines 2005
Engineer electricity
and instrumentation ;Specification
of an industrial control of a treatment plant of industrial wastes located near
Le Havre ;For the reason of an expansion, it was necessary to modify the
whole control system and install a system able to control the new third line of
production and include the existing first and second line.The
control specified brought with it the new existing technologies of optic fiber and high speed resolution .Specification of the new
system of vision of the process with remote-controlled cameras
Mobil Exxon
Subsidiary TRINDEL NIGERIA LIMITED
Subsidiary AMEC SPIE
Location PLATFORM OSO Mobil Exxon
Date December 2004
POST : SUPERVISOR ELECTRICITY
INSTRUMENTATION
Planning and supervision of the installation of the cabling for the
restoration of the new compressor
installed on OSO platform
And supervision of the existing loops in a live
plant.
Client ALSTOM
Subsidiary TEC THERMIC POWERPLANT
Location TAMUIN MEXIQUE
Date July 2002
- November 2002
POST :START UP SUPERVISOR FOR
THE PETCOKE LOADING
TESTING OF ALL CONTROL DEVICES AND
INTERCONNECTION MEDIUM AND LOW VOLTAGE. INSTRUMENTATION. METERING PROTECTION.
PLC. SUPERVISION
Client BOUYGUES
Subsidiary SOYO
Location SOYO BASE OF GIRASSOL
PLATFORM
Date January 2002 - April 2002
POST : BASE’S CHIEF ELECTRICIEN
MAINTENANCE OF POWERPLANTS ; CONDUCTION OF NEW PROJECTS
Client TOTALFINA
Subsidiary HALUL
Location HALUL
Date July 2001
- December 2001
POST :INSTRUMENTATION ENGINEER -
COMMISSIONING
START UP OF THREE GAZ / DIESEL GENERATORS 10
MVA
START UP OF AUXILIARY SERVICES, AIR
COMPRESSORS, GAZ COMPRESSORS HIGH VOLTAGE SUB-STATION
MEDIUM VOLTAGE SUBSTATION
FIRE DETECTION ; HVAC
PLC ALLEN BRADLEY
WITH FIBER OPTIC ETHERNET
SUPERVISORY SYSTEM
Client
Subsidiary
Location
Date Mars 2001
- July 2001
POST : STARTING UP SUPERVISOR –
BACK UP OF THE SUBSIDIARY’S SITE’S CHIEF
CALIBRATION OF ALL INSTRUMENTS AND
ACTUATORS FOXBORO ABB ETC
SUPERVISION OF THE SYSTEM
CONTROL OF THE OFENS IN THE CENTRAL CONTROL SYSTEM SUPPLIED BY SIEMENS
PROFESSIONAL EXPERIENCE :
Client BASF
Subsidiary BASF
Location
Date 1997
POST :GENERAL MANAGER OF SMAR
SETTING IN SERVICE
OF AN AUTOMATIC METERING OF DENSITY OF 250 POINTS THAT HAS REPLACED A MAN METERING INTO
THE CENTRAL SYSTEM HONNEYWELL ; NEW
SYSTEM BASED IN DIFFERENTIAL PRESSURE METERING AND CONVERTED FROM FIELDBUS
PROTOCOL INTO ANALOGIC 4-20mA .
Client SIDERURGIE CSN
Subsidiary VOLTA
REDONDA
Location VOLTA REDONDA BRESIL
Date 1987/1990
POST : SENIOR
APPLICATION ENGINEER
REVAMPING OF THE
FULL CONTROL SYSTEM OF THE HIGH FURNACE NR3 ACCIDENTED , WORK EXECUTED IN
THE FACTORY LOCATED IN
NO INTERRUPTION OF
SERVICE USING HOT STAND BY PLC.
Client NESTLE
Subsidiary
Location
Date 1994
POST : SENIOR
APPLICATION ENGINEER
REVAMPING OF THE
FULL CONTROL SYSTEM OF THE MILK UNLOADING OF A FACTORY PROCESSING MILK;
HOT PASSING AN OLD
CONTROL BASED ON SWITCHES INTO A MODERN CONTROL STATION BASED ON PLC AND TOUCH
SCREEN PANELS NEMATRON;
I HAVE WRITTEN ALL PROGRAMS ANS ALL DATA
SHEETS FOR EXCHANGING CABLING ;WORK EXECUTED IN 3 MONTHS: 2 OF STUDIES AND ONE OF EXECUTION.